Scope of Work for OFC Network Maintenance
Patrolling
The maintenance of OFC routes will be under patroller’s team. The scope of work
includes, that patroller’s team will patrol the total length of OFC routes on
daily basis and keep close watch on the cable routes to prevent OFC damage.
Preventive
and Corrective Maintenance
All measurements for preventive
maintenance shall be carried out as per prior agreed time schedule, which is
given by the Customer EIC. The testing of all fibers shall be done, as once in
a month for each of the block sections and reports shall be submitted. Any
defects observed in the OF cable or in any of the associated equipment shall be
attended in consultation with the Customer EIC at site. During every visit to
the stations for measurements, shall monitor the condition of the optical equipments
installed for any alarms, DG maintenance, Diesel Filling, First level
maintenance for DG, AMF Panel, UPS, Fire Alarms Systems, FMC, NMS, NNMS follow
up for alarms, order wire, battery voltage, level of distilled water in the
secondary cells, top up distilled water if required and observe the condition
of the battery charger and electrical installation of the prefabs / building
and report to EIC in case any discrepancies are observed.